Window and door manufacturing workshop

Project-Based Window & Door Manufacturing

Production

Built Around Your Project.
Controlled Through Every Stage.

A project window and door package brings together materials, technical details, manufacturing and delivery requirements. APRO connects these decisions through a coordinated production process—from aluminum profiles and glass to fabrication, inspection, packing and shipment preparation.

ISO 9001:2015
Certified quality management
10,000+ m²
Monthly window & door production capacity
30,000 m²
Factory floor area
~40 days
Typical lead time for the first container
Schedule agreed according to project volume and requirements.

01 · Materials

Materials That Shape the Result

Aluminum, glass and components are selected to suit your design, performance requirements and project budget.

Workers handling aluminum profiles on a workshop production line

Aluminum Profiles & Finishes

Profile systems and finishes are selected for your design. Materials are checked and organized before fabrication.

Glass sheets and roller conveyors on a processing line

Glass for Your Project

Tempered, laminated or insulating glass can be specified for safety, comfort and appearance, with configurations matched to your window and door system.

Hardware and Sealing Components

Hinges, rollers, locks, gaskets and sealing materials are coordinated with the system and its intended operation. Preparing compatible components helps carry the agreed specification into assembly.

For Your Project Coordinate profile systems, glazing, finishes and hardware around your drawings, performance requirements and architectural intent.

02 · Before Batch Production

From Approved Details to the First Sample

Two operators opening folding door panels in a workshop support frame

Production preparation connects the current drawing revision with product configurations, dimensions, quantities and component requirements. Clear production information gives the team a common reference before work moves into batch production.

For project orders, first-sample or first-article checks focus on the details that need to be confirmed early. Depending on the system, these may include dimensions, assembly fit, glazing and hardware configuration, sealing details, opening and locking operation, and visible finish.

Confirm the first-sample checks, any required adjustments and the approval steps for your order before batch production. Internal checks and any agreed customer sample approval are separate steps.

Detail sequence Check the Current Revision → Build the Sample → Inspect Key Details → Review Adjustments → Confirm Release

For Your Project Use a representative sample to review the configurations and assembly details that matter to your order.

03 · Fabrication & Assembly

Controlled Production on the Shop Floor

Wide view of a window and door production workshop

Window and door fabrication involves connected operations: cutting and machining profiles, assembling frames and sashes, fitting components, and completing the glazing and sealing work required by the system and delivery arrangement.

Work areas, material flow, production instructions and protection of work in progress help keep these operations organized. The relevant system details guide fabrication and assembly, while product identification supports handovers between stages.

  • Profile cutting and machining for the selected system.
  • Frame and sash assembly with coordinated components.
  • Glazing, sealing and hardware fitting as required by the delivery configuration.

For Your Project Fabrication follows the selected opening type, dimensions, configuration and confirmed technical details.

Frame edge assembly and component fitting
APRO quality inspector using a dial caliper on an aluminum frame component
Dimensional checking with a dial caliper.

04 · Quality Management

Quality Checks Throughout Production

Our ISO 9001:2015 certified quality management system provides the management framework for the production and sales activities described in the certificate and site attachment.

Quality checks connect the agreed requirements with the product being made. Incoming material checks, in-process inspections and finished-unit checks address different points along the production route.

Relevant checks may cover dimensions, assembly condition, glass and hardware configuration, surface appearance, sealing details and operation. The inspection priorities, acceptance requirements and any records needed for the order are agreed during project planning.

Factory production checks and third-party performance testing serve different purposes. Where a test report is relevant to a project, its product, configuration and scope need to match the requirement being reviewed.

For Your Project Agree the inspection priorities and the production records needed for your package.

05 · Identification & Storage

Identified and Organized for Your Project

Identification helps connect products with their project requirements as they move through production and storage. Product references, inspection status and storage arrangements support clear handovers and preparation for dispatch.

Where agreed, project labels can be organized around building, floor, opening or unit references. Materials, components and finished products are stored with appropriate separation and protection, then checked against the dispatch requirements.

For Your Project Discuss the references your receiving and installation teams use, so labeling and dispatch information can be planned around them.

06 · Packing & Packing Lists

Packing Matched to the Delivery Plan

Packing is planned around the product configuration, handling requirements and transport arrangement. Protection may include suitable wrapping, edge and corner protection, support frames or crates, according to the agreed packing method.

Agree the package references, contents and quantities to include in your packing list. Clear dispatch information helps the receiving team identify shipments, check quantities and plan onward distribution.

Detail sequence Protect the Product → Identify the Package → Check Contents and Quantities → Reconcile the Packing List

For Your Project Coordinate packing formats, labels and shipment grouping with your delivery and receiving plan.

Workers applying protective wrapping to a timber packing frame
Protective wrapping during packing.
Wrapped door and window units supported in timber packing frames
Packed units with timber support and protective wrapping.
Forklift positioning packed goods inside a shipping container

07 · Shipment Preparation

Container Loading and Shipment Preparation

Shipment preparation brings together packed goods, dispatch information and the loading arrangement. Loading order, placement, support and restraint are considered in relation to the products and shipment plan.

Discuss the loading photographs, container and seal details, and shipment documents needed for your delivery plan before dispatch.

For Your Project Discuss phased shipments and receiving priorities early, so packing and loading arrangements can be coordinated with the agreed programme.

Plan Your Production

Production Questions

Which parts of a package can be customized?

The project may involve choices across systems, dimensions, glass, finishes, hardware, labels and packing. Options are reviewed for technical compatibility and confirmed scope. Changes after approval need to be reviewed against production progress, materials and schedule.

What is checked on a first sample?

The checks depend on the system and purpose of the sample. They may cover dimensions, configuration, assembly details, operation and appearance. Any customer approval or performance testing is agreed separately.

What production records can be reviewed?

Discuss the required inspection, identification, packing and shipment information during project planning. The available records and their format are confirmed for the order.

Can packing and labels follow our project references?

Share your opening schedule, building or floor references and receiving plan early. Suitable labeling and packing arrangements can then be reviewed alongside the product package and delivery requirements.

When are production and shipment dates confirmed?

The first container typically requires around 40 days. The schedule is agreed according to project volume and requirements, with timing for subsequent containers coordinated as part of the delivery plan. The starting milestone and shipment arrangements are confirmed for the order.

Certified Quality Management

ISO 9001:2015

Guangzhou APRO Building Material Co., Ltd. · CQM 00226Q01144R101
Issued 18 March 2026 · Certificate expiry 17 March 2029.
Production and sales of aluminum alloy doors, windows and curtain walls across the sites listed in the certificate and attachment.

Open Complete Certificate and Attachment (PDF)

CQM ISO 9001:2015 main certificateMandatory site attachment listing sales and production scopes

Access Your Download – Tell Us About Your Project First

Please enable JavaScript in your browser to complete this form.
Request A Free Quote!
Please enable JavaScript in your browser to complete this form.

Request A Free Quote!

Please enable JavaScript in your browser to complete this form.
Click or drag files to this area to upload. You can upload up to 5 files.
Each file can be up to 50 MB, with a maximum of 5 files. If your drawings or schedules exceed this limit, please submit the inquiry first. Our project team will contact you and provide a secure way to send the remaining files.